Difference between revisions of "Service:colo-har2k9"

From Eth0Wiki

Jump to: navigation, search
(In contrary to Failbaitrs beliefs, I do not have an evil twin brother)
Line 39: Line 39:
 
   [[User:r3boot|r3boot]] 10 euro
 
   [[User:r3boot|r3boot]] 10 euro
 
   [[User:janklopper|failbaitr]] 10 euro
 
   [[User:janklopper|failbaitr]] 10 euro
 +
 +
Magneetslot is besteld. Totale kosten zijn 77 euro. Gelieve je donaties over te maken naar: J. Both; 38.36.89.643; Rabobank te IJmuiden
 +
 
* Secure windows kist voor access control software
 
* Secure windows kist voor access control software
  

Revision as of 10:00, 18 July 2009

ALL YOUR TUINHUISJES ARE BELONG TO US!

We've got a tuinhuisje! It will be used as a colo on HAR. You can talk to people involved with this in #har-dc on irc.eth-0.nl


Tuinhuisje

Tuinhuisje that will become the colo. It even has a floor, and windows! It is stored in BadBoeli's garage box. It has between 7 and 9 sides, size is about 3-3.5 meters in diameter (we didn't measure, just a guess/assumption).


Managing

We will need one or two people who will manage the colo. That means they have the key, can be called for colo-business and will overlook placement of equipment in the colo. Spider maakt een rooster, aanmelden graag ook even bij haar doen.

Since the Thuinhuisje will also house some hardware not belonging to eth0/mononoke, we need some way of contacting (dect-phone who will travel with the manager on duty), registry (who's hardware is it) and publication (HAR-project). Any ideas? And who wants to take care of this stuff?

Security

Benodigdheden

 Wie betaald er mee aan the lock
 Zarya Max 10 euro
 MishMash 15 euro
 pluisje 10 euro
 Thyrif 10 euro
 r3boot 10 euro
 failbaitr 10 euro

Magneetslot is besteld. Totale kosten zijn 77 euro. Gelieve je donaties over te maken naar: J. Both; 38.36.89.643; Rabobank te IJmuiden

  • Secure windows kist voor access control software

Transportation

We would like to have it finished by the end of the weekend before HAR. Which means building on the 8th, setting up DC-features on the 9th.

  • Tuinhuisje
    • The Tuinhuisje will be picked up by the Mercedes Sprinter (by HAR-logistics)
  • Racks (no pun intended)
    • MishMash may be able to get the racks from r3boot's place (8th or 9th?) (r3boot, do you need to be there?)

Building / Setting up at HAR

Buildplan:

Some poles will be set in the ground for elevation and solid-ness. The walls will be secured to the poles. The walls are numbered and marked so that we can easily sort the wall pieces out on site. The bottom part of the walls will be elevated off the ground, so we will fill the gap with either tarps, plywood or bricks.

The floor is a pressed-wood tangram puzzle that can be secured together with some beams on the bottom-side with nails.

The roof is made up out of eight pizza slices that are made out of two pieces each. These can be secured with bolts in the green set-pieces that can also be attached to the wall's corners. The roof is covered in tar-plates or something, and it has an iron cap to place on top. For extra waterproof-ness we would like to secure another tarp over the entire roof.

Inside:

The inside will be divided into two parts, cold and hot, separated by the racks. A mobile airco will cool the air in front which will cool the server and end up in the hot side, there we can open a window and let the hot air out. Maybe we can even make the hot-zone in a corner so we have more walk space in the cold-zone. The space around the racks may disrupt our hot/cold-zone principle, so we may have to hang some tarps like curtains to stop the hot-zone air from coming back to the cold-zone. Or, if the insulation on the walls (just some tarps) works well enough, we may be able to keep it cold inside the entire Tuinhuisje and keep all the air inside.


Who can participate in building up the Tuinhuisje at HAR? When will we build it? The building will take about 8 hours with two to four people.


Then the Tuinhuisje needs to be set up for colo use. This includes insolation, cooling, airflow, racks, etc.

Who can participate in setting up the Tuinhuisje for colo use? (vex, failbaitr?) -> me thinks that failbaitr is way to busy with HAR building up things ;) Will-Do. How about pluisje?

  • Thyrif
  • Fugu same condition as the previous if it occurs on the weekend before i'm there.
  • Mishmash
  • Aequitas - won't help breaking it down again though.

Building materials

In order to set the tuinhuisje up as a colo, we'll need some stuff to make that happen.


Building materials

  • Long poles to stick in the ground and allow us to raise the tuinhuisje a bit
  • Since the bottom part of the walls were slightly rotten and we might be raising the tuinhuisje a bit, we need some stuff to close it up (bricks, wooden boards, canvas?)
  • We need to make exhausts for the hot air to go out somewhere, maybe rearrange the walls so that at least one window is on the hot side?
  • White paint!


Insolation and waterproof-ness

  • Tarps (can be used for insolation/waterproof-ness as well as seperating the cold and hot sides?) (need a lot)
    • Fail brings a large water proof tarp (5x5)


Cooling


Server stuff

  • Racks
    • r3boot has racks, they need to be picked up in Amersfoort (see Transportation)


Other stuff

  • We will need a lock of some sort
    • Fugu has a SKG** cilinder at home, so if it can house a standard lock cilinder I can bring it, i'll look around over here probably some padlocks around somewhere...
      • I think it has one now, so we could change it. But I'm not sure whether the door will close neatly. Maybe a padlock of some sort might be better?
    • There is a electric lock some were, and i think i can arrange for one as wel
  • 1 DECT phone; for the colo-manager on duty
    • Thyrif has an extra, can be charged on the station at Thyrif's desk in the eth0-computer-boogtent


Tools

  • Hammers
  • Nails
  • Electric screwdriver
  • Some extra screws
  • Wrenches (including size 10)
    • Thyrif has some sort of stuff, will bring it, but we may need more
  • Grounddrill; human powered
    • Thyrif has one, can probably bring it
  • Ducttape
  • Lots of rope for the tarps
  • White paint
  • Fugu will bring his toolbox, includes a.o., hammer, electric screwdriver, wrenches, socket wrench set, screwdrivers, etc.


The network

We've been lended a Foundry BigIron 4k, which will have its own 10G uplink. This will be connected something like below: Porta-dc-network.png The network will be built up in the same way as all the other datenklo's. We'll have our own /23, which has DHCP and RFC2322 support.

What goes in the Tuinhuisje

There will probably fit 2 or three racks in there (if we suspend it high enough, should need only a few cm's) and there might be requests for non-rack hardware. You can ad your hardware here, and there will probably be more people at HAR interested in some rackspace. (wasn't the plan to make it available for other people as well?, sure why not, might make a few bucks to cover the costs)

  • BigIron 4000

MishMash:

  • Storage Server, AMD crap with 3TB in it. NOT RACK MOUNTABLE
  • Access control server (desktop machine, rack mountable!

r3boot:

  • Storage Server, 5U, rack mountable
  • HP P-Class chassis met 8 x BL20G G3 blades, 6U, rack mountable
  • 2 x 19" shelf, which can be used to put non-rackable machines on

FailBaitr:

  • 2u, quad opteron, rack mountable (shelf)
  • 9x 1u dual opteron (maze's search engine / underdark), rack mountable (sliders)
  • 1u dual opteron, uplink firewall, rack mountable (sliders)
  • 3u Quad opteron sun v40z, rack mountable (shelf)