Personal tools

Difference between revisions of "Telecom"

From Eth0Wiki

Jump to: navigation, search
m
m
Line 30: Line 30:
 
----
 
----
  
8 dect base stations 2/2
+
8 dect base stations 2/2<br>
patch rack Cisco
+
patch rack Cisco<br>
2 x 50 port cat3 patch panels
+
2 x 50 port cat3 patch panels<br>
8 x cablu for 16 connections per cable
+
8 x cablu for 16 connections per cable<br>
 
+
<br>
Siemens 3550 Central
+
Siemens 3550 Central<br>
buildup
+
buildup<br>
  
 
----
 
----
  
8 x digital lines
+
8 x digital lines<br>
4 x analog lines
+
4 x analog lines<br>
1 x HXGM IP card
+
1 x HXGM IP card<br>
1 x 2 ISDN trunk card
+
1 x 2 ISDN trunk card<br>
  
 
----
 
----
  
12 x Siemens Hicom Digital phones.
+
12 x Siemens Hicom Digital phones.<br>
26 x Philips Dect set.
+
1 x Patch rack for mounting patch pannels<br>
 
+
26 x Philips Dect set.<br>
(incomming)
+
180 x Siemens Dect sets<br>
180 Siemens Dect sets
 
  
 
<H3>Hardware wanted</H3>
 
<H3>Hardware wanted</H3>
HXGM2 card for Siemens Hicom PRO
+
HXGM2 card for Siemens Hicom PRO<br>
Expension box for Siemens PRO
+
Expansion box for Siemens PRO<br>
Aditional SLC16 cards for the PRO
+
Additional SLC16 cards for the PRO<br>
 
+
4 x patch pannels cat3 for telephone.<br>
 +
10 x Cat3 cables 300 meters for base stations.<br>
 +
Phone cables or cat 5 for phones. (Multi cable?)<br>
 +
Battery packs for Siemens dect sets.<br>
 +
Battery covers for Siemens dect sets.<br>
 +
<br>
 
<H2>Software projects</H2>
 
<H2>Software projects</H2>
Software Programmers needed for statistics read out of central.
+
Software Programmers needed for statistics read out of central.<br>
DB for users to sign up for phone nr.
+
DB for users to sign up for phone nr.<br>
PHP programmers wanting to program agains the serial interface.
+
PHP programmers wanting to program agains the serial interface.<br>
Connect central data card to VOIP server(s).
+
Connect central data card to VOIP server(s).<br>
 +
<br>
  
 +
----
  
 
<H2>What we can / will do on summer edition</H2>
 
<H2>What we can / will do on summer edition</H2>
Setup Dect / Gap coverage on the field.
+
Setup Dect / Gap/ Voip network coverage on the field.<br>
 +
<br>
 +
----
 +
First access to system 11-02-2010<br>
 +
First 64 Ports have been patched.<br>
 +
YeP fist Base Station has green light. \0/ 12-02-2010<br>
 +
----

Revision as of 21:49, 13 February 2010

Eth0Winter2010.jpg
This is information about the Eth0:2010 Summer Edition.
Eth0Winter2010.jpg

Telecom Page

Team Phone

Who can will help

Boelens

Brainstorm

Hardware

Hardware around

Siemems 150E PRO central Buildup


Kaart 1: CBMOD processorcard + CGM "Clock Module Generator"
kaart 1 :SLMO24 board S30810-Q2901-X for connection of 24 digital OPTISET/OPTIPOINT stations
kaart 2 :SLMO24 board S30810-Q2901-X for connection of 24 digital OPTISET/OPTIPOINT stations
kaard 3 : Cordless SLC16 CMI Card S30810-Q2922-X-0 for connection of 16 Base Stations Cordless V2.2
kaart 4 : SLA16N Analog Suscriber Interface (S30810-Q2929-X100) ,16 circuits /analog stations
kaart 5 : SLA16N Analog Suscriber Interface (S30810-Q2929-X100) ,16 circuits /analog stations
kaart 6 : STMD 8 isdn connections S0
Power supply


8 dect base stations 2/2
patch rack Cisco
2 x 50 port cat3 patch panels
8 x cablu for 16 connections per cable

Siemens 3550 Central
buildup


8 x digital lines
4 x analog lines
1 x HXGM IP card
1 x 2 ISDN trunk card


12 x Siemens Hicom Digital phones.
1 x Patch rack for mounting patch pannels
26 x Philips Dect set.
180 x Siemens Dect sets

Hardware wanted

HXGM2 card for Siemens Hicom PRO
Expansion box for Siemens PRO
Additional SLC16 cards for the PRO
4 x patch pannels cat3 for telephone.
10 x Cat3 cables 300 meters for base stations.
Phone cables or cat 5 for phones. (Multi cable?)
Battery packs for Siemens dect sets.
Battery covers for Siemens dect sets.

Software projects

Software Programmers needed for statistics read out of central.
DB for users to sign up for phone nr.
PHP programmers wanting to program agains the serial interface.
Connect central data card to VOIP server(s).


What we can / will do on summer edition

Setup Dect / Gap/ Voip network coverage on the field.


First access to system 11-02-2010
First 64 Ports have been patched.
YeP fist Base Station has green light. \0/ 12-02-2010